logo-ri

Repositório Institucional da Produção Científica da Marinha do Brasil (RI-MB)

Use este identificador para citar ou linkar para este item: https://www.repositorio.mar.mil.br/handle/ripcmb/451187
Registro completo de metadados
Campo DCValorIdioma
dc.contributorCarneiro, Luiz Otávio Ribeiro-
dc.contributor.advisorCarneiro, Luiz Otavio Ribeiropt_BR
dc.contributor.authorTeixeira, Vagner Barros-
dc.date.accessioned2018-07-04T18:27:00Z-
dc.date.available2018-07-04T18:27:00Z-
dc.date.issued2014-
dc.identifier.urihttp://www.repositorio.mar.mil.br/handle/ripcmb/451187-
dc.descriptionA partir da década de 80 a fronteira da exploração de petróleo em alto mar começou a caminhar para regiões cada vez mais distantes da costa atingindo profundidades progressivamente maiores. Esta mudança teve como reflexos alteração nos custos, avanços tecnológicos e necessidade de novos tipos de instalações para desempenhar a função das tradicionais plataformas de produção que não tinham capacidade de armazenamento nem possibilidade de bombeio da produção devido a distância e a não existência de oleodutos instalados. Uma solução encontrada foi a transformação de navios petroleiros do tipo Very Large Crude Carrier (VLCC) em FPSO onde foram instalados equipamentos para processamento de petróleo e outros, adequando a embarcação a seu novo tipo de atividade. Em alguns projetos, os navios que possuíam propulsão por turbinas a vapor tiveram seu sistema de propulsão removido, uma vez que não seria mais necessário, e tiveram mantido o sistema de geração de vapor, a fim de atender sistemas originais da embarcação e a outros que foram adicionados. Os cuidados necessários para uma boa operação do sistema de geração de vapor não tiveram mudança significativa, porém, algumas condições se alteraram. Um FPSO é projetado para ficar no campo de produção, em alto mar, por aproximadamente 20 anos. A facilidade de estar periodicamente em um porto ou realizando reparos num estaleiro deixaram de existir. Os requisitos de segurança, de logística para o embarque de pessoas e material e a limitação do número de pessoas embarcadas entre outros aspectos, exigiram adequação da gestão da embarcação para atender as diversas necessidades e manter em operação sistemas como a geração principal de energia, a capacidade de transferência de óleo (offloading) e a injeção de água no reservatório de petróleo (sistemas fundamentais num FPSO). Todos estes sistemas dependem diretamente do sistema de vapor e consequentemente de um correto tratamento de água para caldeiras.en_US
dc.description.abstractFrom the 80s the frontierof oil exploration offshore began walking toward more distant regions of the coast reaching progressively greater depths. This change was reflected as changes in costs, technological advances and the need for new types of facilities to perform the function of traditional production platforms that had no storage capacity or allow pumping of production due to distance and lack of pipelines installed. One solution was to change the oil tankers of the Very Large Crude Carrier (VLCC) in FPSO where processing equipment for oil and other were installed, adjusting the vessel to its new type of activity. In some designs, the ships that had propelled by steam turbines had removed its propulsion system, since it would no longer necessary, and had kept the steam generation system in order to meet unique systems of the vessel and the others who were added. Necessary for proper operation of the steam generation system care had no significant change; however, some conditions have changed. An FPSO is designed to remain in the field of production, offshore, for approximately 20 years. The ease of being periodically in a harbor or doing repairs in a shipyard ceased to exist. The security requirements of logistics for the embarkation of persons and equipment and limiting the number of people embedded among other things, demanded adequacy of the management of the vessel to meet the diverse needs and maintain operating systems as the main power generation capacity, oil transfer (offloading) and the injection of water into the oil reservoir (core systems on a FPSO). All of these systems depend directly on the steam system and consequently a correct water treatment for boilers.-
dc.language.isoporpt_BR
dc.publisherCentro de Instrução Almirante Graça Aranha (CIAGA)pt_BR
dc.rightsopenAccesspt_BR
dc.subjectÁgua - purificaçãopt_BR
dc.subjectTratamento da águapt_BR
dc.subjectCaldeiras a vapor marítimaspt_BR
dc.subjectTratamento da águapt_BR
dc.subjectCorrosão e anticorrosivospt_BR
dc.titleTratamento de água para caldeiras em unidades flutuantes de produção, armazenamento e transferência de petróleo (FPSO)pt_BR
dc.typebachelorThesispt_BR
dc.location.countryBrasilpt_BR
Aparece nas coleções:Ciência, Tecnologia e Inovação: Coleção de Trabalhos de Conclusão de Curso
Multidisciplinar: Coleção de Trabalhos de Conclusão de Curso

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
000003d1.pdf1,11 MBAdobe PDFThumbnail
Visualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.