Title: Design and evaluation of a Physical Protection System for a radioactive waste intermediary storage
Authors: Vasconcelos, Victor de Castro
Fontes, Gladson Silva
Tavares, Renato Luiz
Keywords: Nuclear security
Nuclear waste storage
Physical Protection System
DGPM knowledge areas: Engenharia nuclear
Issue Date: 2022
Publisher: Brazilian Journal of Radiation Sciences (BJRS)
Citation: VASCONCELOS, V. de C.; FONTES, G. S.; TAVARES, R. L. Design and Evaluation of a Physical Protection System for a Radioactive Waste Intermediary Storage. Brazilian Journal of Radiation Sciences, [S. l.], v. 10, n. 4, p. 1–17, 2022. DOI: 10.15392/2319-0612.2022.2097.
Description: The present work aimed to describe, present, and evaluate a Physical Protection System (PPS) for a hypothetical facility of an intermediate radioactive waste deposit, following international and national security criteria. Therefore, it carried out an evaluation of the Physical Protection System (PPS) applying the DEPO (Design and Evaluation Process Outline) methodology with a sequence of three phases of the protection system design and assessment of its vulnerabilities. The overall assessment of PPS was performed from the calculation of the overall probability of system effectiveness (PE) through the methods of adversary sequence diagrams, path analysis, and neutralization analysis. PPS presented a PE value of only 6.5%, three improvements were proposed and their impacts were analyzed. The reduction of the response time of the security forces led to a value of 78% of the PE and the increase of the time delay (TD) in the barriers closer to the target made the PPS efficiency reach 92%, higher than the acceptable value of 85%. The results showed that the evaluation of the proposed hypothetical project allowed adaptations so that the ideal level of PPS effectiveness could be reached with few interventions. The initial project was prepared in accordance with current regulations (traditional prescriptive approach) and, even so, presented a low probability of overall effectiveness, leading to the need for adjustments that were only possible by applying the DEPO methodology (performance-based approach).
Access: Open access
URI: https://www.repositorio.mar.mil.br/handle/ripcmb/846005
ISSN: 2319-0612
Type: Journal article
Appears in Collections:Engenharia Naval: Coleção de Artigos

Files in This Item:
File Description SizeFormat 
Artigo_Victor_Vasconcelos.pdf615,82 kBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.